The crews were working fast and furious when I got there this afternoon. The siding guys had most of the back of the house done (last photo), but couldn't finish around the picture window because it was not just delivered broken, it was delivered with a bent/warped frame that couldn't be installed. Inside, the guys had almost the entire first round of tape/mud done, and it'll have to dry a day or two before they do the second round. Photos, from top to bottom, 1) The guys on stilts were amazing!; 2) Finishing up the ceiling of the main entrance; 3) The master bedroom with the bathroom door on the left and the door to the hallway on the right; 4) The steps.