At 8:30 this morning the crew had most of the drywall installed on the main floor ceilings and was working fast on the upstairs. Photos, from top to bottom, 1) The living room, with drywall waiting to be installed; 2) Looking from the kitchen area, with the ceiling covered; 3) Jasper's bedroom, with ceiling covered; 4) Looking up into the laundry room from the entrance, with the ceiling covered.
No comments:
Post a Comment