Thursday, July 19, 2012
Day 35: Windows, early electric
Today's work included a 9 a.m. plumbing inspection that I assume the home passed, window installation and early work on electric boxes and lighting. Photos, from top to bottom: 1) A look at the front of our home, sans garage - note the windows!; 2) Another look at the front; 3) View from the back of the home - our sliding glass door was also installed today; 4) Can lights, water lines and drain pipes within floor joists; 5) A switch box and outlet in the kids' bathroom upstairs; 6) The kitchen window; 7) A look inside our office, where there will be a built-in corner shelf, which you can see is framed out about halfway up the wall; 8) Close-up view of the same corner
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment