Monday, August 20, 2012
Day 67: Paint update, floor prep
The flooring (and crew) arrived on Monday and so did an electrician, who wired most of the outlets, light switches, and installed most of the fixtures including the ceiling fans. The flooring crew had the entire subfloor laid down by the time I got there after work and said they'd have the entire main level done in about a day or so.
Photos, from top to bottom, 1) Looking down from the second floor; 2) A sample of the flooring; 3) The kitchen, now featuring pendant lights; 4) The upstairs hallway, showing one of its two light fixtures; 5) Our living room ceiling fan; 6) The office, with built-in shelves and French doors; 7) Door/trim/light switch in Avery's bedroom; 8) The stairway; 9) The mantle and fireplace.